Describes the systematic process of documenting, and placing into service newly–installed, or retrofitted electrical power equipment and systems. This document shall be used in conjunction with the most recent edition of the ANSI/NETA Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems (ANSI/NETA ATS).
Voltage Classes Addressed
References
ASHRAE, ANSI/NETA ATS, NECA, NFPA 70E, OSHA, GSA Building Commissioning Guide
“... to bridge the gap between acceptance testing and electrical commissioning... completes the electrical system overall acceptance process. Again, from individual component testing to assurance that all integral components are functioning as a complete unit within design requirements and manufacturer’s published data; along with the correct operation of all interlock safety devices for fail-safe functions; and the correct operation of all sensing devices, alarms, and indicating devices.”
Ron Widup, “Bridging the Gap from Acceptance Testing to Commissioning”
NETA World Journal, Spring 2015, page 96